VRF Installation & Maintenance Simulation · Experience 4 of 7

Indoor Unit Installation & Piping Integration VR Simulation Training

Trainees measure and drill the fixing points, install the mounting brackets and hang the VRF indoor unit ready for its piping and drainage connections.

Book a free demo
Indoor Unit Installation & Piping Integration VR Simulation Training

Project Details

Marking & Drilling

Fixing points are measured from the ceiling before drilling.

  • Measure the 40 cm distance and mark the points.
  • Drill the holes with the rotary hammer.
  • Insert the wall anchors.

Mounting the Brackets

The brackets carry the full weight of the indoor unit.

  • Fix the brackets with the impact driver.
  • Check that the brackets are level.
  • Confirm the bracket spacing matches the unit.

Hanging the Unit

The indoor unit is lifted onto the brackets at the highlighted location.

  • Place the unit in the indicated position.
  • Check alignment and clearances.
  • Prepare the unit for piping and drainage connections.

Project Video

Explore More Projects

Build measurable HVAC training with custom VR simulations

Turn installation, inspection, and maintenance procedures into clear interactive training.

Talk to ASFAN