VRF Installation & Maintenance Simulation · Experience 4 of 7
Indoor Unit Installation & Piping Integration VR Simulation Training
Trainees measure and drill the fixing points, install the mounting brackets and hang the VRF indoor unit ready for its piping and drainage connections.
Book a free demo
Project Details
Marking & Drilling
Fixing points are measured from the ceiling before drilling.
- Measure the 40 cm distance and mark the points.
- Drill the holes with the rotary hammer.
- Insert the wall anchors.
Mounting the Brackets
The brackets carry the full weight of the indoor unit.
- Fix the brackets with the impact driver.
- Check that the brackets are level.
- Confirm the bracket spacing matches the unit.
Hanging the Unit
The indoor unit is lifted onto the brackets at the highlighted location.
- Place the unit in the indicated position.
- Check alignment and clearances.
- Prepare the unit for piping and drainage connections.
Project Video
Explore More Projects
Build measurable HVAC training with custom VR simulations
Turn installation, inspection, and maintenance procedures into clear interactive training.
Talk to ASFAN

