VRF Installation & Maintenance Simulation · Experience 7 of 7

Outdoor Condensing Unit Installation & Final Connections VR Simulation Training

Trainees place the VRF outdoor condensing unit on its supports, connect the refrigerant lines and wiring, and wrap the pipes with insulation tape to finish the system.

Book a free demo
Outdoor Condensing Unit Installation & Final Connections VR Simulation Training

Project Details

Positioning the Unit

The outdoor unit is placed at the location shown by the guide arrows.

  • Set the unit on stable supports.
  • Keep the clearances needed for airflow.
  • Check that the unit is level.

Final Connections

The refrigerant pipes and cables are connected to the outdoor unit.

  • Connect the liquid and gas lines.
  • Connect the power and communication cables.
  • Follow the highlighted routes to the unit.

Insulation & Completion

The installation is finished and checked.

  • Wrap the pipes with insulation tape.
  • Inspect all connections.
  • Confirm the task is complete.

Project Video

Explore More Projects

Build measurable HVAC training with custom VR simulations

Turn installation, inspection, and maintenance procedures into clear interactive training.

Talk to ASFAN