VRF Installation & Maintenance Simulation · Experience 6 of 7

Wall Coring & Service Route Preparation VR Simulation Training

Trainees prepare the service route along the wall, cut and fit the copper pipe sections and angle pieces, and place them through the wall openings in the indicated positions.

Book a free demo
Wall Coring & Service Route Preparation VR Simulation Training

Project Details

Service Route

The route for pipes and cables is set out along the wall and corners.

  • Follow the marked route on the wall.
  • Keep the route straight and accessible.
  • Check the route against the building layout.

Cutting & Fitting Pipes

Copper pipes are prepared on the work table before installation.

  • Cut the pipes to length with the pipe cutter.
  • Fit the angle pipes at each corner.
  • Use the brazing station where joints are needed.

Placing the Pipes

Each prepared section is placed in its indicated location.

  • Grab the angle pipe and place it at the marked point.
  • Pass the pipes through the wall opening.
  • Inspect the finished route before connection.

Project Video

Explore More Projects

Build measurable HVAC training with custom VR simulations

Turn installation, inspection, and maintenance procedures into clear interactive training.

Talk to ASFAN